Bremen Am Wall 117–125
Mixed-Use Development Investment Opportunity

Bremen Am Wall 117–125

Prime Old Town Repositioning Opportunity

Bremen Old Town, Germany
~12,158 m² Total Area
135 Parking
3 Buildings
2 Scenarios

Project Overview

About This Project

Am Wall 117–125 is a centrally located three-building ensemble in the historic core of Bremen. Positioned minutes from the pedestrian zone, the asset offers a clear repositioning profile with multiple value-creation levers—supported by resilient demand drivers and strong alignment with the Bremen 2035 city-centre revitalisation strategy.

The investment case is defined by two development pathways—a value-preserving refurbishment (“The Bulwark”) and an alternative new-build vision (“The Weserperle”). This dual-track approach enables risk-adjusted execution depending on planning feasibility, market timing, and tenant demand.

Visual Management Summary

Selected visuals are excerpted from a German-language investment memorandum and provided for orientation.

Management summary excerpt for Bremen Am Wall 117–125
Management summary (excerpt).

Executive Summary

  • Asset: Am Wall 117–118, Am Wall 119, Am Wall 121–125
  • Total area: ~12,158 m² (three buildings)
  • Parking: 135 spaces (incl. 130 underground)
  • Current status: partially leased legacy stock + a larger block currently vacant (repositioning lever)
  • Strategy: refurbishment vs. new build—flexible capital allocation and phasing

Project Visuals

Exterior front view of Bremen Am Wall 117–125
Exterior front view (indicative render).
Exterior angle view of Bremen Am Wall 117–125
Exterior angle view highlighting the ensemble massing.
Evening exterior view of Bremen Am Wall 117–125
Evening perspective (indicative render).
Interior impressions of Bremen Am Wall 117–125
Interior impressions (indicative).

Asset Overview and Micro-Location

Asset overview and key facts for Bremen Am Wall 117–125
Asset overview and key facts (excerpt).
Micro-location analysis for Bremen Am Wall 117–125
Micro-location overview in the Old Town context (excerpt).

Strategic Context

Bremen combines a diversified industrial base with a strong education ecosystem—supporting stable demand for modern residential and commercial space in the city centre.

Indicator Snapshot
GDP per capita ~€57,000
Population ~570,000
Forecast growth to 2035 ~2.0%
Universities 9
Students 40,000+
Prime office rent (city centre) ~€22.0/m²
New-build residential average ~€13.40/m²
Micro-apartments (<25m²) ~€38.55–€72.50/m²
Market analysis snapshot for Bremen
Market snapshot and demand drivers (excerpt).

Value-Creation Strategy

Development scenarios for Bremen Am Wall 117–125
Two-track strategy: refurbishment (“The Bulwark”) vs. new-build vision (“The Weserperle”).

Scenario 1 — Refurbishment (“The Bulwark”)

  • Façade renewal and upgrade to modern performance standards
  • Full strip-out enabling flexible layouts and future-use optionality (incl. office-to-residential conversion)
  • Building integration across the ensemble (where feasible)
  • Time- and cost-efficient alternative to a full redevelopment

Scenario 2 — New Build (“The Weserperle”)

  • Context-sensitive landmark design aligned with the Old Town urban fabric
  • Optimised layouts for micro-apartments and hotel segments
  • South-facing terraces and high daylight concept
  • Sustainability-led architecture approach to reduce operational footprint

Indicative Financial Snapshot

  • Year 5 NOI: €1.69m (refurbishment) vs. €2.48m (new build)
  • Delta: +47% higher NOI in the new-build scenario (Year 5)

All figures are indicative and subject to technical and commercial due diligence.

Risk Management and Governance

Risk assessment and mitigation strategies for Bremen Am Wall 117–125
Risk factors and mitigation strategies (excerpt).
  • Market: diversified leasing strategy and continuous monitoring
  • Financing: fixed-rate structures and flexible payment terms
  • Delivery: experienced contractors and structured project management
  • Regulatory: legal counsel and ongoing planning / zoning monitoring

Next Steps

  1. Confirm technical baseline (structure, MEP, façade, parking) and derive capex scenarios.
  2. Validate target positioning and leasing strategy (office / residential / micro-living / hospitality).
  3. Assess planning feasibility, timeline, and phasing for both development pathways.
  4. Refine the financial model and execution roadmap based on due diligence outputs.
UAM Services:
  • Investment Analysis
  • Financial Forecasting
  • Market Research
  • Development Strategy

Project Details

Category
Mixed-Use Development
Type
Urban Regeneration / Mixed-Use Redevelopment
Location
Bremen Old Town, Germany
Status
Investment Opportunity

Distances

Pedestrian zone
A few minutes on foot

Investment Highlights

Key Value Propositions

Strategic Old Town Location

Central positioning within Bremen’s historic core, minutes from the pedestrian zone—an established micro-location with resilient demand drivers.

Two Value-Creation Pathways

Refurbishment and new-build options enable flexible capital deployment and a risk-adjusted strategy tailored to market timing and planning outcomes.

Alignment with Bremen 2035

The development logic supports the city’s revitalisation agenda: modern standards, new living/working space, and preservation of urban character.

Attractive Upside Potential

Indicative Year 5 NOI shows meaningful uplift potential, particularly in a micro-apartment / hotel-optimized new-build scenario.

Property Details

Features & Specifications

Asset Composition

  • Three-building ensemble: Am Wall 117–118, 119, 121–125
  • Total gross floor area: ~12,158 m²
  • 135 parking spaces (incl. 130 underground)
  • Partially leased legacy stock + fully vacant larger block

Market & Fundamentals

  • Prime office benchmark: ~€22.0/m² (city centre)
  • New-build residential average: ~€13.40/m²
  • Micro-apartments (<25m²): ~€38.55–€72.50/m²
  • GDP per capita ~€57k; 9 universities; 40k+ students

Scenario 1 — Refurbishment (“The Bulwark”)

  • Façade renewal with floor-to-ceiling window concept
  • Full strip-out enabling flexible layouts and future-use optionality
  • Integration of buildings 117 and 121–125
  • Cost- and time-efficient compared to a full rebuild

Scenario 2 — New Build (“The Weserperle”)

  • Iconic design respecting the Old Town fabric
  • Optimised for micro-apartment and hotel segments
  • South-facing terraces and high daylight concept
  • Sustainability-led architecture approach

Risk Management

  • Diversified leasing strategy and continuous monitoring
  • Fixed-rate financing structures and flexible payment plans
  • Experienced contractors and detailed project management
  • Legal advisory and zoning / plan monitoring

Interested in This Project?

Contact our team to learn more about investment opportunities and partnership options.